Fauji Kabirwala Power Station, Pakistan
The 155MW Fauji
Kabirwala Combined Cycle Power Station was constructed, at a cost of
US$170M under a 30 year “build, own and operate” agreement, to help
alleviate the critical shortfall in Pakistan’s power generation
capacity.
During the later
stages of construction two separate incidents occurred; a fire in
the Air Inlet Housing to one of the gas turbines and the failure of
the Steam Turbine bearings. In both instances the financial losses
incurred by the contractor construction the power station were
significant.
ICC were retained to
advise and assist in the evaluation of both incidents and in the
determination of the quantum for both claims.
|